Method Statement For Glass Installation. Professionally Installed Stained Glass In San Antonio. Glass should be installed with the correct edge resting on the setting blocks so that all sheets of glass are equally supported. ← Safe work Method of Statement for Installation of Gypsum Board Ceiling Specification for Installation Method Statement of Pipe Hangers & Supports →.
This method statement should be read in conjunction with the Structural Engineer's and Architect's drawings and the attached illustrations.
Download package contains the Method Statement +.
This method statement would be used to make sure the proper way of • GI Duct and Fittings • Fiber Glass Duct Insulation • Hanger and Supports • Duct Adhesives. As mentioned, there are several methods of stained glass installation and which one is right for you depends on what you are trying to achieve. Method statements are widely used in construction as a means of controlling specific health and safety risks that have been identified (perhaps following the preparation of a risk assessment) such as; lifting operations, demolition or dismantling, working at height, installing equipment, the use of plant.






